Module
Form factor40-ft ISO skid
Dimensions12.2 × 2.44 × 2.77 m
Filled mass≤ 25 t
TransportStandard flatbed truck
InstallCrane lift · weeks, not months
Performance
Output15-20 t CO₂ / day
Purity96-99%
Capture rate90-95% (tuneable)
Feed range3-30% CO₂
CO₂ deliveredAtmospheric · < 50 °C
Site requirements
Heat sourceWaste heat 300-400 °C
Electrical< 100 kWh/t · ~80-100 kW
Ground~30 m² per module
WaterNone for capture
StaffingUnattended · existing crew
Benefits
Chemical-free - inert ceramic sorbent, multi-year replacement cycle
No pressure vessels, no solvent handling, no capture water
Modular - add capacity by adding modules, relocatable
Independent modules - no single point of failure
~£12 / t CO₂
Capture cost on genuinely waste heat at design concentration (12-15% CO₂). At lower concentrations (gas-turbine / marine feed at 3-8%) cost is higher, ~£17-20/t. Excludes compression, transport and storage.